Hi,
I have 4 nodes hyper-v on windows 2012. When I do shutdown or reboot 1 node. it shuts down VMs , move them to another node, and start the VMs.
Is there a way to configure it to do live migration automatically when a host node is shutting down?
Thank you.
-Mehdi