Does anybody know whether you can move a VMware RDM from an existing VMware VM by first powering it off and removing the mapping and then present the same to a Hyper-V R2 cluster and attach it to a Hyper-V R2 VM. For example, in this scenario, we would use SCVMM 2008 with SP1 to V2V the VMware VM to Hyper-V R2 but of course won't be converting the RDM (that contains a lot of data) to a VHD. We would then want the RDM to be presented to the Hyper-V R2 Cluster and then added to the converted VM as a pas through disk. Would this work or would the partition be unique to the original VMware VM?
Any other advice appreciated.